Precautions before and after assembly of motor automation equipment
Time:2020-07-27  Click Volume:

Pay attention to the following points before assembling motor automation equipment:


1. Work data: there are general assembly drawings, component assembly drawings, parts drawings, material BOM lists, etc., until the end of the project, the integrity of the drawings, cleanliness, and process information records must be ensured.


2. Workplace: The placement and assembly of parts must be carried out in the specified work place. The place for the placement and assembly of the whole machine must be clearly planned until the end of the entire project. All work places must be kept neat, standardized and orderly.


3. Assembly materials: The assembly materials specified in the assembly process must be in place on time. If some non-deterministic materials are not in place, you can change the order of operations, and then fill in the material reminder and submit it to the purchasing department.


4. Before assembly, understand the structure, assembly technology and process requirements of the equipment.


The inspection work after assembly of motor automation equipment includes:


1. After completing the assembly of a component, check the following items. If assembly problems are found, they should be analyzed and dealt with in time.


A. The completeness of the assembly work, check the assembly drawings, and check for missing parts.

B. For the accuracy of the installation position of each part, check the assembly drawing or check the requirements as described in the above specification.

C. The reliability of each connection part, whether each fastening screw meets the required torque for assembly, and whether the special fastener meets the requirements for preventing loosening.

D. The flexibility of the movement of movable parts, such as whether there is jamming or lagging phenomenon, whether there is eccentricity or bending when conveying rollers, pulleys, guide rails, etc. are manually rotated or moved.


2. After the final assembly is completed, the connection between the assembly parts is mainly inspected, and the inspection content is based on the "four characteristics" specified in (1) as the measurement standard.


3. After the final assembly, the iron filings, debris, dust, etc. should be cleaned up in all parts of the machine to ensure that there are no obstacles in each transmission part.


4. When testing the machine, carefully monitor the startup process. After the machine starts, immediately observe whether the main working parameters and moving parts are moving normally.


5. The main working parameters include the speed of movement, the stability of movement, the rotation of each drive shaft, temperature, vibration and noise.